TitleProduct

Precision CNC Machining Uav Parts&Integy Parts Aluminum Alloy

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Guangdong

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-17 09:52

  • Browse the number:

    164

Send an inquiries
+
Beigain (HK) Tech Ltd.
Contactaixin:

Mr. Harry(Mr.)  

Email:

telephone:

phone:

Arrea:

Guangdong

Address:

No. 2, Junpeng Road, Qingyunlin Industrial Zone, Shitanbu Community, Tangxia Town, Dongguan, Guangdong, China 523717

Website:

http://beigain.jinghan51.com/

+

 Precision CNC Machining UAV Parts&Integy parts Aluminum Alloy
- These parts are custom made only, not in stock; We can produce ba
sed on your drawings or samples.
- We can sign NDA(Non-disclosure Agreement) with you if you need; 
- Supplying Capacity: 200,000pcs monthly; Small orders are welcome.
Product Name CNC Machining Service (CNC Milling Part, CNC Turning Part)
Material Alloy (aluminum,zinc,steel,copper)Brass,Bronze,Aluminum,Stainless steel,Plastic (ABS,PC,PMMA,POM)
Color Black,White,Blue,Red,Green,Yellow,Purple,Silver,Other color
Surface Treatment Anode,Sanding,Polishing,Matte,Electroplating
Lead time & Packing 7~15 days for sample,15~25 days for production.
3~5 days via express:DHL,FedEx,UPS,TNT,etc.
Standard export carton with pallet
Quality Control CMM (2.5D coordinate measuring machine) , 2.5D projector
Thread gauge,hardness,caliber,A closed-loop QC system
Third party inspection available if required
Main Areas Lighting industry,Diving industry,Medicine,Auto parts,Digital industry,Other precision part industry
Trade term EXW,FOB,CIF,CFR
Drawing format JPEG,PDF,DWG,DXF,IGS,STEP,CAD
Payment Term 30% Deposite,70% before shipping.T/T,Paypal or western Union is acceptable
Product show






FAQ

Q: Are you trading company or manufacturer?
A: We are a customized factory.
 
Q: What do you need to provide a quote?
A: Please kindly send us the drawing of your product. Details below should be included,
1.Materials 2. Tolerance 3. Quantity 4.Surface Finish
 
Q: How long is your delivery time?
A: Generally it is 7-15 days for samples and 15-25 days for mass production, it is according to quantity.
 
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the samples. Just need some sample cost and we'll return it back when proceed into mass production.
 
Q: What is your terms of delivery?
A: We accept FOB, CFR, CIF,etc. You can choose the one which is the most convenient or cost effective for you.