TitleProduct

Carbon Steel/4.8/8.8/10.9 Galvanized Handle Screw for Railway Bridge

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Fujian

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-27 20:08

  • Browse the number:

    155

Send an inquiries
+
Xiamen Changchun Import & Export Co., Ltd.
Contactaixin:

Mr. Rich(Mr.)  

Email:

telephone:

phone:

Arrea:

Fujian

Address:

404room, No. 9b Electric Valley, Jimei, Xiamen, Fujian, China 361023

Website:

http://cc-screw.jinghan51.com/

+

Handle Screw
 Screws are generally called wood screws; is the tip of the kind of tip, pitch larger, generally used to tighten wood parts, plastic parts. Mechanical screws, is the front of the kind of screws, the pitch is small, uniform, generally used to fasten the metal, machine parts.Screw application range
1> stainless steel plate, metal plate, galvanized steel plate, engineering installation.
2> metal curtain wall metal light compartment and other indoor and outdoor installation. 
3> General angle steel, channel steel, iron plate and other metal materials combined installation. 
4> car trunk, container box, shipbuilding, refrigeration equipment and other assembly works.
5> automobile engine, heavy machinery, garden machinery, petrochemical.
6> aerospace, energy, machinery, chemical, military, metallurgy, mold, hydraulic.
7> motorcycles, sports equipment, cars and many other industries.
8> electronics, electrical appliances, motors, lighting, communications, home appliances, furniture.
Brand name CHANGCHUN Model CC-001 Type Non-standard screw
Head Type Hobbing Groove type 12 teeth Screw diametre 12mm
Screw Length 105mm Application Hand twist Screw size M2.5
Thread tolerance 6G Nominal length 110mm Surface Galvanized

Shipping and packaging
 Ocean shipping
North America, South America about 40 working days
Eastern Europe about 30-40 working days
Southeast Asia about 20-30working days
Africa about 35-45 working days
India, Pakistan about 40 working days
Korea, Japan about 40 working days

Air transport
Other places around 1-3 business days
Packaging: boxes, cartons or plastic bags, or according to customer needs.

Sample service 
If you need sample,you need pay the freight.

Our factory












other products